Sull-Yeang High-Rise

Monday, June 14, 2010

Final Deflection Video

›

Final Member Sizes and Structure

›
We understand that even after three iterations, some of our members are still too big. We ended up having to add more columns in our skycour...

Re-Sizing Comparisons

›

Re-Sizing Data

›
Monday, June 7, 2010

Live, Dead and Wind Loads

›
Thursday, June 3, 2010

Test Loading

›
Here the structure is loaded with 100 KIPS East. The video shows the possible deflection of the members.
Tuesday, June 1, 2010

1st Iteration Structure

›
This iteration is without any loading. Loaded structure coming soon...
Monday, May 24, 2010

FINAL MODEL 1/16" = 1' : 0"

›
Our final model... -Grand Corner Entrance -235,000 Total Square Feet -Height = 653 Feet -40 levels, including street, 1st terrace, upper ter...

Final Model FAR Calculations

›
FLOORS SQFT QTY. SQFT Roof ~ 8100 1 8100 37 ~ 6500 1 6500 34, 35, 36 ~...

Final Model Floors Plans

›

FAR calculations

›
Lot size 160' x 100' = 16,000 sqft FAR 15 16000 sqft x 15 = 240,000 sqft Plaza...

2nd Iteration

›
On this iteration we incorporated more of Ken Yeang's attributes...skycourts, lots of open communal space, tall ceilings, vertical lands...

1st Massing Model Iteration

›
Our main concept was to incorporate a large wind gap that would allow natural ventilation. The gap is open from the South East to allow in ...